Empire Products BF-10-2 Owner's Manual Page 9

  • Download
  • Add to my manuals
  • Print
  • Page
    / 20
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 8
16943-10-0314 Page 9
On Sheet Rock Wall
1. After locating mounting holes, drill (4) 5/16" (8mm) diameter
holes into the wall.
2. Insert (4) plastic expansion anchors provided into the holes.
3. Tighten (4) #10 x 1" (25mm) screws provided into the plastic
expansion anchors. Do not completely tighten screwheads to
the plastic expansion anchors, leave a 1/8" (3mm) gap between
screwheads and plastic expansion anchors.
4. Mount heater onto the (4) screwheads and complete tightening
the screwheads to the plastic expansion anchors.
Attention! Use the following steps to properly align the upper
louver and the reector with the heat shield.
a. When replacing upper louver, be sure the bottom lip of upper
louver goes behind the heat shield.
b. When replacing reector, be sure the top lip of reector
goes in front of the heat shield.
5. Connect the gas line.
Figure 8
OUTLINE OF
OUTER CASING
MOUNTING HOLE LOCATIONS
VIEWED FROM FRONT OF HEATER
FLOOR
2” (51mm) MIN.
2 1/32” (52mm)
4 1/32”
(102mm) MIN.
18 7/8”
(479mm)
1 3/32”
(28mm)
24 1/8” (613mm)
20 1/8” (511mm)
2”
(51mm)
2”
(51mm)
22”
(559mm)
BF-30
Figure 7
BF-10 and BF-20
Figure 6
Refer to Figures 6 and 7 for measurements in order to locate (4) mounting holes on wall. Figures 6 and 7 are the front views of the
heater.
1. Remove lower louver from casing assembly (2 screws).
2. Remove reector from casing assembly (2 screws).
3. Remove upper louver from casing assembly (2 screws).
On Solid Wall
1. After locating mounting holes, attach (4) #10 x 1" (25mm) screws provided into the wall. Do not completely tighten screwheads to the
wall, leave a 1/8" (3mm) gap between screwheads and wall.
2. Mount heater onto the (4) screwheads and complete tightening screwheads into the wall.
Attention! Use the following steps to properly align the upper louver and the reector with the heat shield.
a. When replacing upper louver, be sure the bottom lip of upper louver goes behind the heat shield.
b. When replacing reector, be sure the top lip of reector goes in front of the heat shield.
3. Connect the gas line.
18” (457mm)
14” (356mm)
2”
(51mm)
2”
(51mm)
1 3/32”
(28mm)
18 7/8”
(479mm)
OUTLINE OF
OUTER CASING
4 1/32”
(102mm) MIN.
2 1/32” (52mm)
MOUNTING HOLE LOCATIONS
VIEWED FROM FRONT OF HEATER
FLOOR
2” (51mm) MIN.
22”
(559mm)
WALL MOUNT INSTALLATION
Page view 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 ... 19 20

Comments to this Manuals

No comments